Our company since its inception, always regards product quality as enterprise life, continuously improve production technology, improve product quality and continuously strengthen enterprise total quality management, in strict accordance with the national standard ISO 9001:2000 for High Carbon Prestress Wire Drawing Line, Copper Casting Machine, Inverted Single Block Drawing Machine, "Making the Products of High Quality" is the eternal goal of our company. We make unremitting efforts to realize the goal of "We Will Always Keep in Pace with the Time".
Professional Design Planetary Steel Stranding Machine - Wet steel wire drawing machine PengSheng Detail:
Machine model
LT21/200
LT17/250
LT21/350
LT15/450
Inlet wire material
High /Medium / Low carbon steel wire;
Stainless steel wire; Alloy steel wire
Drawing passes
21
17
21
15
Inlet wire Dia.
1.2-0.9mm
1.8-2.4mm
1.8-2.8mm
2.6-3.8mm
Outlet wire Dia.
0.4-0.15mm
0.6-0.35mm
0.5-1.2mm
1.2-1.8mm
Drawing speed
15m/s
10
8m/s
10m/s
Motor power
22KW
30KW
55KW
90KW
Main bearings
International NSK, SKF bearings or customer required
Product detail pictures:
Related Product Guide:
"Quality very first, Honesty as base, Sincere assistance and mutual profit" is our idea, in an effort to create consistently and pursue the excellence for Professional Design Planetary Steel Stranding Machine - Wet steel wire drawing machine PengSheng , The product will supply to all over the world, such as: Czech, Munich, United Arab emirates, We pursue the management tenet of "Quality is superior, Service is supreme, Reputation is first", and will sincerely create and share success with all clients. We welcome you to contact us for more information and look forward to working with you.
Good quality and fast delivery, it's very nice. Some products have a little bit problem, but the supplier replaced timely, overall, we are satisfied. By Fay from Norway - 2017.02.14 13:19
This manufacturers not only respected our choice and requirements, but also gave us a lot of good suggestions, ultimately, we successfully completed the procurement tasks. By Yannick Vergoz from Doha - 2018.06.18 19:26